WE have developed a reputation for excellence, reliability and efficiency and are one of the leading structural
steelwork fabricators and engineers. Our company offers a comprehensive service; design, supply
, fabrication, and erection of all types of steel framed structures. No matter what your requirements, Trishul will provide the premium structural steel work solution for you.
We are one of the very few structural steelwork companies who offer a complete package from design through to
erection using only our own labour, plant and machinery.
Only our men, with our plant, on your site; that's our way.
Our design department is capable of delivering the most economic of steelwork solutions drawing from our wealth of
experience, cutting-edge design and modelling software and years of suc
cessful structural steelwork supply to a multitude of different market sectors.
As registered vendors & contractors with Toyota, Tata, Maruti Suzuki, Hyundai, General Motors, L&T, Mazagon Docks
Ltd, Reliance Petrochemicals, IntasPharma, Torrent Pharma, BL Kashyapand with the help of our highly experienced
team of professionals we have acquired special technical skill of working as per technical specifications of world
leading technologies of Japan, UK, Germany, France, Korea etc.
Profile of the executed works:
SYSTEM INSTALLATION
- Removal & Reinstallation M-Jig 8 Mtr.-30 Tons-TOYOTA
- Installation of Gun Pole Mtr.-5 Tons -TOYOTA
- Erection of Paint Robotic System -16 mtr.-15 Tons.
- Design supply and Installation of Paint Inspection Booth (Paint Hospital) in Toyota
- Erection of 32.5 MVA-65 Tons Transformer-Jamnagar
- Installation of Zinc Oxide Plant with Oil Fired Oven-25 Tons-Daman.
- HVAC System (Design, supply and installation of 90Tr AC plant with chiller unit)
- Heavy Structural Fabrication of 28 Mtr. Height Industrial Shed
- Supply and Installation of piping and structure
(1" dia to 10" Dia, MS,GI,SS and CS, HDP)
- ETP Plant (Project ) installation of piping, structure and equipment – 50 MT
- Insulin Project (installation, testing, commissioning)
- HVAC System/GAMU. Installation, testing and commissioning of piping, structure and equipment
- Heavy Machinery Installation – 650 MT
- Pipe Racks
- Utility chiller piping (installation, testing and commissioning) – 10MT (1" to 14") (MS, GI, Seamless)
- Installation, alignment of floor conveyors at TOYOTA SITE. PLANT –II – 400 MT
- Fabricated Material.- 220 MT
- Various Booths, Lighting Booths, Structure, Mezzanine Floor, various equipment installation.- 500 MT
- Installation alignment of D/H conveyor at Maruti Suzuki-1200 MT
- Installation of electrical of Daifuku-Japan conveyer at Mitsubishi Lancer
- Installation alignment of O/H conveyor TELCO
- Design, manufacture, supply and installation of full ED Busbar system including current collector mechanism, up to 2500
Amp. capacity